Electrical installation and commissioning support for a new parcel sortation system at a La Poste hub outside Paris.

01  /  SITE  ·  IMG PENDING
IMG / 01 SITE OVERVIEW · IMG PENDING
IMG / 02 DETAIL
IMG / 03 DETAIL
// Replace IMG/01‑03 with on‑site photos
02  /  ENGAGEMENT

WHAT WE DID.

La Poste required the full electrical fit‑out of a new cross‑belt sortation system at one of its Paris regional hubs. Scope included cable tray infrastructure, power and signal cable pulling, cabinet connection and commissioning support.

Our crew of six electricians worked under a named EL‑02 supervisor, coordinating directly with the OEM's commissioning engineers and the French client's site management.

The project was delivered in under 10 weeks, including a structured commissioning phase with full safety circuit verification and handover documentation in French and English.

03  /  SCOPE

FOUR WORKSTREAMS.

SCOPE 01

Cable Tray

Installation of galvanised cable tray and ladder infrastructure across sorter hall.

SCOPE 02

Cable Pulling

Power, signal and bus cable to drawing. Labelled and tested.

SCOPE 03

Cabinet Connection

Field device wiring and connection into OEM control cabinets.

SCOPE 04

Commissioning

Safety circuit verification, continuity testing, OEM handover.

04  /  OUTCOME

RESULT

Sortation system commissioned and handed over within contracted schedule. Live operation at target throughput from week one.

// STATEMENT 00

We do not sell promises. We commission lines — and we leave when they run.