Electrical installation and commissioning support for a new parcel sortation system at a La Poste hub outside Paris.
La Poste required the full electrical fit‑out of a new cross‑belt sortation system at one of its Paris regional hubs. Scope included cable tray infrastructure, power and signal cable pulling, cabinet connection and commissioning support.
Our crew of six electricians worked under a named EL‑02 supervisor, coordinating directly with the OEM's commissioning engineers and the French client's site management.
The project was delivered in under 10 weeks, including a structured commissioning phase with full safety circuit verification and handover documentation in French and English.
Installation of galvanised cable tray and ladder infrastructure across sorter hall.
Power, signal and bus cable to drawing. Labelled and tested.
Field device wiring and connection into OEM control cabinets.
Safety circuit verification, continuity testing, OEM handover.
Sortation system commissioned and handed over within contracted schedule. Live operation at target throughput from week one.
We do not sell promises. We commission lines — and we leave when they run.