Mechanical assembly and electrical installation for a sortation line extension at Amazon's DE5 logistics centre in Erfurt.

01  /  SITE  ·  IMG PENDING
IMG / 01 SITE OVERVIEW · IMG PENDING
IMG / 02 DETAIL
IMG / 03 DETAIL
// Replace IMG/01‑03 with on‑site photos
02  /  ENGAGEMENT

WHAT WE DID.

Amazon DE5 required a capacity expansion of its existing parcel sortation line during a live operational window. The extension added roughly 380 m of new conveyor, a cross‑belt sorter module and the associated electrical infrastructure.

Our scope combined MA‑01 (mechanical assembly) and EL‑02 (electrical installation) into a single delivery led by a named site supervisor. The crew worked primarily during night and weekend windows to avoid impacting live sortation operations.

The full scope was delivered on schedule, commissioned alongside the OEM's controls team and handed over with a complete as‑built documentation pack.

03  /  SCOPE

FOUR WORKSTREAMS.

SCOPE 01

Conveyor Extension

380 m of roller and belt conveyor — frames, rollers, drives, guarding.

SCOPE 02

Sorter Module

Cross‑belt sorter assembly, alignment and drive commissioning.

SCOPE 03

Cable Tray & Pulling

Full cable management infrastructure — tray, trunking, power and signal cable.

SCOPE 04

Cabinet Connection

Field device wiring, safety circuits, controls handover to OEM.

04  /  OUTCOME

RESULT

Line extension commissioned on schedule with zero impact on parallel sortation operations.

// STATEMENT 00

We do not sell promises. We commission lines — and we leave when they run.